# An angle and a distance · Surveying 101 | Global Mapping

> A total station measures where it points and how far the prism is. With that, and its own position, it computes the coordinates of the point. Lesson 2 of 8 of Surveying 101, a free interactive course by Global Mapping.

Page: https://globalmapping.biz/en/tutorials/surveying/total-station

---

# An angle and a distance · Surveying 101

A free interactive surveying course: UTM coordinates, total station, traverse, levelling, GNSS RTK, detail survey and contours, stakeout and slope monitoring, on a 3D model of a mine.

Every lesson is practised on a 3D model of a mining operation: move a control and the scene and the figures change. The same content, as text:

## The course in words

1.  Lesson 1

    ### [Where a point is](/en/tutorials/surveying)

    Three numbers place any point: Easting, Northing and elevation. With two points we compute the distance, the direction and the slope between them.

    Surveying measures the ground to draw it and to build on it. It all starts with knowing where each point is, and that takes three numbers: Easting, Northing and elevation.

    In Peru we work in UTM coordinates on the WGS 84 datum. The country falls in zones 17, 18 and 19 south; this site is in 18 south. Easting and Northing are metres on the grid of the zone. Elevation is the height above mean sea level.

    With the coordinates of two points we solve the “inverse”: how far one lies east and north of the other, the distance between them, the azimuth and the slope. A total station does this sum when it is oriented or stakes out, and a design program every time it labels a distance or a bearing.

    -   Azimuth is counted from north, clockwise, from 0° to 360°
    -   Horizontal distance comes from ΔE and ΔN; slope distance adds the height difference
    -   Grid north, true north and magnetic north are three different directions
2.  Lesson 2

    ### [An angle and a distance](/en/tutorials/surveying/total-station)

    A total station measures where it points and how far the prism is. With that, and its own position, it computes the coordinates of the point.

    A total station is a theodolite with a distance meter. It measures two angles (the horizontal one, read on a fixed graduated circle as the alidade turns with the telescope, and the vertical one, from the zenith) and the slope distance to a prism, with an infrared or laser signal that goes there and back: the instrument measures its phase shift or its travel time.

    It is set up over a point of known coordinates and oriented by sighting another known point: the backsight. From then on the horizontal angle is the azimuth, and every shot to the prism becomes Easting, Northing and elevation. That is called a radial survey.

    Two things go wrong in the field: the line of sight and the heights. The station only measures what it sees, and from outside the pit the crest hides the benches. Instrument and prism heights go into the elevation of every point: a pole height written down wrong moves the whole survey.

    -   Orienting makes the horizontal angle the azimuth
    -   Horizontal distance = slope distance × sin V
    -   The elevation adds the instrument height and subtracts the prism height
3.  Lesson 3

    ### [Closing the loop](/en/tutorials/surveying/traverse)

    A traverse carries coordinates from station to station with angles and distances. When it leaves A and comes back to A, the closure tells how much error the walk picked up.

    From A we do not see the whole pit. To give coordinates to far points we set up on a chain of points that see each other: at each one we measure the angle between the previous station and the next, and the distance to the next.

    With the backsight to B, the first angle gives the first azimuth, and each angle after that turns the azimuth of the leg before. Azimuth and distance give the ΔE and ΔN of each leg, and they add up: that is how coordinates travel.

    A closed traverse checks its own angles and closure, but not everything: a scale error in the distances or an error in the starting azimuth closes just as well. The interior angles must add up to (n − 2) × 180°, and the ΔE and ΔN must add up to zero. They never do: what is left over is the misclosure, and if it is within tolerance we spread it over the legs.

    -   Next azimuth = previous azimuth + 180° + measured angle
    -   Linear misclosure over the perimeter gives the relative precision 1:N
    -   The compass rule spreads the error in proportion to each distance
4.  Lesson 4

    ### [Height difference](/en/tutorials/surveying/levelling)

    A level looks along a horizontal line. What it reads on the staff behind minus what it reads on the staff ahead is the height difference between the two points.

    Differential levelling is the most precise way to carry an elevation. The level stands between two staffs and its telescope always turns in a horizontal plane. If it reads 2.820 m behind and 0.246 m ahead, the point ahead is 2.574 m higher.

    A staff is 4 m long, so on a steep ramp each setup climbs little. The staff ahead stays as a turning point, the level moves on and the staff behind goes ahead. The elevation travels from BM-1 to BM-2 setup by setup.

    No level is perfect: its line of sight tilts a few seconds. With equal backsight and foresight distances, the error is the same in both readings and cancels. With unequal sights it adds up at every setup.

    -   Height difference = backsight reading − foresight reading
    -   Distance to the staff = 100 × (upper hair − lower hair)
    -   Equal sights cancel collimation, curvature and most of the refraction
5.  Lesson 5

    ### [Position from satellites](/en/tutorials/surveying/gnss)

    A GNSS receiver fixes its position by measuring its distance to the satellites it sees. With a base on a known point and a radio, the rover goes from metres to a centimetre.

    A GNSS receiver measures its distance to each satellite from the time the signal takes to arrive. With four satellites it solves four unknowns: its three coordinates (which the receiver turns into Easting, Northing and height above the ellipsoid) and the error of its own clock. That height is not the elevation: the geoid undulation is taken off it, with a model such as EGM2008 or with levelled benchmarks. On its own it typically lands within 1 to 3 m in plan, more in height.

    In RTK a base is set up on a known monument and sends its corrections by radio to the rover, once a second. The rover measures the carrier phase; when it resolves the whole number of cycles, the solution is fixed: a centimetre in plan and about two in elevation.

    Geometry rules. Satellites spread across the whole sky give a low PDOP; bunched together or hidden by the pit walls, the PDOP climbs and the solution degrades. That is why we work with several constellations and an elevation mask of 10° to 15°.

    -   Four satellites is the minimum; an RTK fix asks for five or more
    -   Precision ≈ DOP × range error: geometry multiplies the error
    -   On the pit floor the walls hide the low sky; GPS alone is sometimes not enough
6.  Lesson 6

    ### [From points to contour lines](/en/tutorials/surveying/detail-survey)

    A crew measures points on the ground; the software joins them into triangles and draws the contour lines from them. Which points we take decides how true the model is.

    In a detail survey the crew walks the ground with the rover or the prism and measures a point wherever the shape changes: crests, toes, road edges, changes of slope. Each point carries Easting, Northing and elevation.

    The software joins the points into a network of triangles (TIN). Each triangle is a plane through three measured points: between them, the model assumes the ground is flat. The contour lines are cut on those planes.

    That is why where we measure matters. An even grid lands anywhere on the wall and rounds every bench. Points on the breaklines, the crest and the toe, mark the exact edge; on the flat berms a few are enough.

    -   We measure where the slope changes, not at equal distances
    -   Contours come from the triangles: an error in the TIN is an error in the contours
    -   Breaklines are declared in the software so that no triangle crosses them
7.  Lesson 7

    ### [From the plan to the ground](/en/tutorials/surveying/stakeout)

    Stakeout is surveying in reverse: the point already has coordinates on the plan, and the station tells the rodman how far to move until he stands on it.

    In a survey we measure what is there. In a stakeout we take to the ground what does not exist yet: the corners of a pad, the axis of a road. The coordinates come from the design plan and the job is to mark each one with a stake.

    The station is set up over a known point and oriented to another, as in a radial survey. For each design point it computes azimuth and distance, measures to the prism and gives the difference: away or closer, left or right. The rodman moves and the station measures again until he is inside the tolerance.

    Over the point the station also measures the ground elevation. The difference with the design elevation is the cut or the fill, and it is written on the stake: it is what the dozer operator needs to read.

    -   Design azimuth and distance come from the coordinates
    -   We correct step by step until inside the tolerance
    -   Cut = ground elevation − design elevation
8.  Lesson 8

    ### [Slopes that move](/en/tutorials/surveying/monitoring)

    A robotic total station measures the same prisms day and night. What matters is not how far a slope has moved, but whether it moves faster and faster.

    In an operating pit the walls move. To know how much, we fix prisms on the crests and benches, and a robotic total station on a stable pillar measures them one by one, in cycles, around the clock. Two reference prisms on stable ground check that the station has not moved.

    Each prism gives a displacement and a velocity. A wall creeping at 1 or 2 mm/day can go on like that for months. The danger is acceleration: when the velocity rises day after day, the mass is breaking loose. That is why alert thresholds are set on velocity, and every mine sets its own.

    With an acceleration like that, the inverse of the velocity falls almost in a straight line (Fukuzono). Extended to zero, it gives a possible failure date. It is an alarm to evacuate and inspect, not an exact date.

    -   A stable pillar, prisms on the wall and two stable references
    -   Alerts are set mainly on velocity and its trend; total displacement comes second
    -   Inverse velocity projects a possible failure date

---

More about Global Mapping: [llms.txt](/llms.txt) · [sitemap](/sitemap.xml) · [contact](/en/contact)